Georgia Institute of TechnologyGeorgia Water Resources Institute Mega Cities Water forum 2006 - Atlanta, GeorgiaHAD Power Plant, Aswan, EgyptNilometer, Roda Island, Cairo, Egypt
In 1998, the Yangtze River floods killed 3,004 people, left 14 million homeless, and caused $24 billion in economic losses.

National Institute for Water Resources

« December 2009 »
SunMonTuesWedThursFriSat
 12345
6789101112
13141516171819
20212223242526
2728293031 

Research at GWRI

Management of Lake Lanier

Category: Research at GWRI
Posted by: Kaushik Surendran

1992-04-01

A New Reservoir Control Approach With Application to the Management of Lake Lanier 

 

 

Sponsor: GWRI

Start Date: 1992-04-01; Completion Date: 1992-04-01;

Keywords: Reservoir Operation, Electric Power, Water Supply, Competing Uses, River Forecasting

Description:

A major complicating factor in water resources systems management is handling unknown inputs. Stochastic optimization provides a sound mathematical framework but requires that enough data exist to develop statistical input representations. In cases where data records are insufficient (e.g., extreme events) or atypical of future input realizations, stochastic methods are inadequate. This article presents a control approach where input variables are only expected to belong in certain sets. The objective is to determine sets of admissible control actions guaranteeing that the system will remain within desirable bounds. This approach is applied to the operation of Lake Lanier, a U.S. Army Corps of Engineers multiobjective reservoir and is shown to be an effective management tool. This investigation led to the following conclusions: (1) Increases of dependable energy generation are possible, albeit at the expense of wider reservoir level fluctuations and more frequent water shortages. Thus, recreation and water supply reliability are in conflict with energy generation. (2) Good quality forecasts can minimize lake level fluctuations and, at the same time, meet higher dependable energy commitments and water supply requirements. (3) Forecasting also facilitates reservoir operation with maximum outflow and generation hour restrictions. Such constraints can be used to minimize off-peak energy generation, thus maximizing overall energy value.

Technical Report


Principal Investigator: Aris Georgakakos (GWRI/Georgia Tech)      About...
Principal Investigator: Huaming Yao (GWRI/Georgia Tech)      About...